Misplaced Pages

List of Interstate Highways in New Jersey

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

The Delaware River–Turnpike Toll Bridge is a four-lane, steel through arch bridge crossing the Delaware River between Burlington Township , Burlington County , New Jersey and Bristol Township , Bucks County , Pennsylvania , United States. As a part of Interstate 95 (I-95), it is a major highway link between Philadelphia and New York City . The bridge also connects the Pennsylvania Turnpike 's east-west mainline with the main trunk of the New Jersey Turnpike , via the Pearl Harbor Memorial Turnpike Extension (formerly known as the Pennsylvania Extension). Tolls are collected only in the west/southbound direction via electronic toll collection .

#148851

55-594: There are ten Interstate Highways in New Jersey , including four primary routes and six auxiliary routes. The longest of these is Interstate 95 (I-95), which runs for 89.22 miles (143.59 km) from Florence Township to Fort Lee . The shortest Interstate in New Jersey is I-278 , which runs for 2 miles (3.2 km) from Linden to Elizabeth before crossing into Staten Island, New York. Interstate 95 in New Jersey Interstate ;95 ( I-95 )

110-640: A hairpin turn around Leonia to the southeast into Fort Lee and heads due south to Route 4 . I-95 runs under the Edgewood Road Bridge here, an overpass that runs high above the highway, and is considered an iconic view for drivers entering New Jersey from the George Washington Bridge. After the overpass, I-95 runs in between the travel lanes of Route 4 as the freeway comes to a large interchange with southbound exits and northbound entrances for Route 4, US 1/9 , US 46, and

165-450: A 3–2–2–3 lane count, soon interchanging with CR 56 as it passes northwest of Overpeck County Park . The highway turns east as it skirts the border between Englewood to the north and Leonia to the south. After crossing CSX Transportation 's Northern Branch , the highway enters inhabited areas as it passes over Route 93 / CR 501 (Grand Avenue) and has a northbound exit and southbound entrance serving Broad Avenue. I-95 forms

220-681: A barrier in Carlstadt , following which the road comes to a northbound exit and southbound exit and entrance for the Meadowlands Sports Complex and the American Dream Meadowlands shopping and entertainment complex. In Ridgefield , the two segments of the New Jersey Turnpike merge again, with the road continuing north into Ridgefield Park . In Ridgefield Park, I-95 continues north as a toll-free highway cosigned with

275-557: A full interchange with the southern terminus of US 9W (Fletcher Avenue). At this location, the New Jersey Turnpike officially ends and the jurisdiction changes from the NJTA to the PANYNJ. Here, US 1/9/US 46 all join I-95 and the road continues southeast containing four local lanes and four express lanes in each direction, passing numerous highrise buildings through Fort Lee. The road has

330-625: A gap existed on I-95 within New Jersey for roughly 35 years. Northbound I-95 ended at US 1 in Lawrence Township where the road became I-295. Meanwhile, southbound I-95 entered New Jersey on the George Washington Bridge and continued along its present-day routing down the New Jersey Turnpike and across the Delaware River–Turnpike Toll Bridge, where the road became I-276 at the Pennsylvania state line. Until this gap

385-578: A high-speed, low-interruption route from New York City to the Midwest , both the PTC and the NJTA undertook the building of the Delaware River–Turnpike Toll Bridge (known locally as the "Turnpike Connector Bridge") to connect the two highways. This required an amendment to the Pennsylvania Constitution to allow the state to enter into the agreement. A local AAA chapter spearheaded a failed effort to have

440-494: A photo of the vehicle's license plate and mail a bill to the vehicle owner. The toll is collected only from traffic crossing into Pennsylvania, as with the other bridges across the Delaware River. On January 20, 2017, the bridge was closed after a fracture was discovered in a steel component. On February 3, 2017, Pennsylvania Turnpike officials announced that the bridge would remain closed until at least April 2017. The failure

495-550: A proposed freeway north to the planned I-80 , then head east to the George Washington Bridge. The road was designated as part of I-95 in 1958. In the 1960s, the I-95 approach to the George Washington Bridge was completed, connecting to I-80 in Teaneck. The portion of I-95 between the north end of the New Jersey Turnpike and I-80 opened in 1971. Originally maintained by NJDOT, ownership of I-95 north of US 46 in Ridgefield Park

550-563: A route that was to run from the Yardley–Wilburtha Bridge around Trenton south to Hammonton . Seven northeastern states from Virginia to Massachusetts including New Jersey proposed a limited-access highway in 1942 called the 7-State Highway; this was never built. The New Jersey State Highway Department proposed Federal Aid Interstate Route 103 in 1956, and it was approved in 1957 by the Bureau of Public Roads (BPR). At that time,

605-609: A southbound exit and northbound entrance to Route 67 from the express lanes before coming to the northbound-only toll plaza for the George Washington Bridge . Past the toll plaza, there is a southbound exit and northbound entrance for the Palisades Interstate Parkway , also from the express lanes. After the Palisades Interstate Parkway, the road crosses high over Henry Hudson Drive , then

SECTION 10

#1732858895149

660-442: A toll plaza on the ramp to southbound I-95. After this interchange, the road comes to a toll barrier that marks the beginning of the turnpike ticket system northbound and the end of the ticket system southbound. The Pearl Harbor Memorial Turnpike Extension crosses into Mansfield Township and passes under I-295 before merging into the mainline of the New Jersey Turnpike at exit 6. At this point, I-95 continues northeast on

715-824: Is a major Interstate Highway that runs along the East Coast of the United States from Miami, Florida , north to the Canada–United States border at Houlton, Maine . In New Jersey , it runs along much of the mainline of the New Jersey Turnpike (exit 6 to exit 18), as well as the Pearl Harbor Memorial Turnpike Extension (formerly and still commonly known as the Pennsylvania Turnpike Connector; from exit 6 to

770-625: Is also part of I-95. I-95 enters the state from the Pennsylvania Turnpike on the Delaware River–Turnpike Toll Bridge, following the length of the Pearl Harbor Memorial Turnpike Extension to exit 6 on the New Jersey Turnpike mainline, continuing north along the remainder of the latter road to U.S. Route 46 (US 46), where it continues as the turnpike's I-95 extension to the George Washington Bridge, on which it enters New York . All of I-95 in New Jersey

825-697: Is maintained by the New Jersey Turnpike Authority (NJTA) except for the George Washington Bridge, which is maintained by the Port Authority of New York and New Jersey (PANYNJ). Until 2018, I-95 had been discontinuous within New Jersey. From Pennsylvania , I-95 entered New Jersey on the Scudder Falls Bridge and ended at US 1 in Lawrence Township , where the freeway then turned south as I-295 . From New York, I-95 continued from

880-559: The Delaware River–Turnpike Toll Bridge ), and the New Jersey Turnpike's I-95 Extension (from exit 18) to the George Washington Bridge for a total of 77.96 miles (125.46 km). Located in the northeastern part of the state near New York City , the 11.03-mile (17.75 km) Western Spur of the New Jersey Turnpike, considered to be Route 95W by the New Jersey Department of Transportation (NJDOT),

935-596: The Delaware River–Turnpike Toll Bridge , pending the construction of an interchange where the Pennsylvania Turnpike crossed existing I-95 in Pennsylvania. As a result of this cancelation, the federal government gave New Jersey $ 246 million (equivalent to $ 657 million in 2023 ) for road projects in the area where the Somerset Freeway was to be built. In 1995, increasing truck traffic on US 206 and Route 31 motivated officials in Mercer County to have

990-471: The Hudson River on the George Washington Bridge, which has eight lanes total on the upper deck (the express lanes) and six lanes total on the lower deck (the local lanes). US 46 terminates at the state border between New Jersey and New York, while I-95 and US 1-9 continue into upper Manhattan . What became I-95 and I-295 around the northern part of Trenton was first legislated as part of Route 39 ,

1045-858: The New Jersey Meadowlands . After both the western and eastern spurs cross the Passaic River on the Harry Laderman and Chaplain Washington Bridges, the mainline of I-95 officially follows the Eastern Spur of the New Jersey Turnpike, which has exits to I-280 in Kearny , Hudson County , and the Secaucus Junction train station and Route 3 / Route 495 in Secaucus , where it reaches

1100-675: The Pennsylvania Turnpike and Interstate 95 in Bristol Township is the replacement of the Delaware River Bridge. As originally planned, a second, parallel span of the bridge identical in appearance to the original 1956 span was to be constructed. However, in March 2020 the New Jersey Turnpike Authority announced in their capital improvement plan that the 1956 span will be replaced and a new study will be formed to determine

1155-607: The Scudder Falls Bridge and its approach (Route 129), opened in 1961 to Scotch Road, due in part to low design standards of the Trenton Freeway. As a result, I-95 was routed to use the Scudder Falls Bridge approach. The approach to the Scudder Falls Bridge was extended in 1974, northeast to the planned interchange with the new I-95 freeway, and then east to US 1 as I-295. From the I-95/I-295 loop around Trenton,

SECTION 20

#1732858895149

1210-484: The 1950s to fill mistakenly drilled holes." The bridge reopened to traffic on March 9, 2017, with unseasonably warm weather helping speed up work in repairing the bridge. On September 22, 2018, the bridge became part of Interstate 95 when the Pennsylvania Turnpike/Interstate 95 Interchange Project 's first components of construction were completed. Previously, the Pennsylvania side of the bridge and

1265-523: The 1980s after the Somerset Freeway's cancelation. As a result of this project, I-95 was rerouted from its former alignment in Pennsylvania and New Jersey to the easternmost part of the Pennsylvania Turnpike, replacing I-276 between the interchange and the Delaware River. In addition, I-295 was extended from its former northern terminus at US 1 westward (highway north) to the Scudder Falls Bridge and southward (highway west) through Pennsylvania to

1320-448: The Delaware River (except for the Dingman's Ferry Bridge , which is privately owned). Each state is responsible for its half of the bridge up to the state line (as evident in a recent redecking project in which the PTC redecked its half of the bridge with fresh concrete first, with the NJTA following later in a separate project). The final component of the direct interchange project between

1375-552: The Delaware River in Burlington Township , Burlington County , where the road continues west (south) into Pennsylvania as the Pennsylvania Turnpike . From the river, I-95 follows the six-lane Pearl Harbor Memorial Turnpike Extension of the New Jersey Turnpike east into New Jersey. Continuing east through a mix of fields and warehouses into Florence Township , the highway passes over NJ Transit 's River Line and has an interchange serving US 130 . This interchange has

1430-499: The Delaware River–Turnpike Toll Bridge are high level crossings). In May 1998, the Pennsylvania Turnpike Commission began a $ 17 million project to re-deck the Pennsylvania part of the bridge and place a Jersey wall . Emergency shoulders were added, but the bridge's capacity was altered from six to four lanes. At the Pennsylvania approach, new toll lanes were added to accommodate the toll collection system. In 2001,

1485-686: The George Washington Bridge southward along the New Jersey Turnpike and west along the Pearl Harbor Memorial Turnpike Extension to end at the Pennsylvania state line, where I-276 continued into that state along the Pennsylvania Turnpike. This discontinuity was caused by the 1983 cancelation of the Somerset Freeway , which would have connected the former Trenton segment of I-95 in Hopewell Township northeast to I-287 in Piscataway . From here, I-95 would have followed present-day I-287 to exit 10 on

1540-512: The I-95 gap was made official on September 22, 2018, before the completion of Stage 1. The entire route is in Bergen County . Delaware River%E2%80%93Turnpike Toll Bridge The bridge was built by both the Pennsylvania Turnpike Commission (PTC) and the New Jersey Turnpike Authority (NJTA) when the PTC completed the "Delaware River Extension" of the Pennsylvania Turnpike between Valley Forge and Bristol Township in 1955, while

1595-402: The NJTA built the 118-mile (190 km) NJ Turnpike between Penns Grove and Ridgefield Park between 1950 and 1952. While the Pennsylvania Turnpike itself predates its New Jersey counterpart by over 10 years (the original Irwin-Carlisle section opened in 1940), the expansion of the Pennsylvania Turnpike to a cross-state highway was put on hold for the duration of World War II . Starting with

1650-507: The New Jersey Turnpike (mainline and Pennsylvania Extension) and George Washington Bridge had been completed; US 46 connected the north end of the New Jersey Turnpike to the bridge. The BPR approved the planned alignment north of the Trenton area, which would have run generally northeast to exit 9 ( Route 18 ) of the New Jersey Turnpike. From there, it would use the New Jersey Turnpike to its north end (exit 18, US 46) and

1705-543: The New Jersey Turnpike and maintained by the NJTA. This section of the Turnpike from this point to the George Washington Bridge approach is designated the “I-95 Extension” of the Turnpike. It has a large interchange serving US 46 , part of which was the original northern terminus of the turnpike before it was extended. From this point, it has the appearance of a local–express lane configuration carrying three local lanes and two express lanes (3–2–2–3) in each direction, but

List of Interstate Highways in New Jersey - Misplaced Pages Continue

1760-718: The New Jersey Turnpike heads northeast to the I-287 / Route 440 junction in Edison . In Woodbridge Township , the highway comes to a large interchange accessing both the Garden State Parkway and US 9 . From this point, the road enters areas of heavy industry and comes to the County Route ;602 (CR 602) exit in Carteret . In Union County , I-95 comes to the I-278 exit on

1815-426: The New Jersey Turnpike in Edison . In order to fill the gap, the Pennsylvania Turnpike/Interstate 95 Interchange Project saw the construction of an interchange between the Pennsylvania Turnpike and I-95 in Bristol Township, Pennsylvania , with I-95 being rerouted to use the Pennsylvania Turnpike to the Delaware River–Turnpike Toll Bridge. By March 2018, the former I-95 around the north side of Trenton to just across

1870-487: The New Jersey Turnpike. Due to this opposition, New Jersey Governor Brendan Byrne announced in 1980 that the state would not build the Somerset Freeway. The US Congress officially canceled the Somerset Freeway by way of the Surface Transportation Assistance Act of 1982, rerouting I-95 south on the New Jersey Turnpike to exit 6, and onto its Pennsylvania Extension to end at the state line on

1925-404: The Scudder Falls Bridge in Pennsylvania became an extension of I-295, with I-295 extended to the interchange by July of the same year. On September 22, 2018, the ramps connecting I-95 and the Pennsylvania Turnpike opened, allowing a direct freeway route from Philadelphia to New York City and finally completing I-95 as a whole. I-95 enters New Jersey at the Delaware River–Turnpike Toll Bridge over

1980-554: The Somerset Freeway, was intended to terminate in Piscataway at I-287, and I-95 would have continued east along present day I-287 until it intersected with the New Jersey Turnpike in Edison Township. The I-287 designation would probably have been truncated to begin at the junction with the Somerset Freeway. Both the Somerset Freeway and I-695 were projected to cost $ 55 million (equivalent to $ 384 million in 2023 ) in 1967, with

2035-573: The adjacent turnpike was designated Interstate 276 . The Turnpike Connector bridge is operated jointly by the PTC and the NJTA, neither of which is subject to the interstate rules and regulations of the other dual-state authorities — Delaware River Port Authority (DRPA); Burlington County Bridge Commission (BCBC); Delaware River and Bay Authority (DRBA); and the Delaware River Joint Toll Bridge Commission (DRJTBC) — which operate nearly all other bridges across

2090-465: The approved design called for Stage 1 to tentatively end in 2020. Groundbreaking for the interchange took place on July 30, 2013, with Pennsylvania Governor Tom Corbett in attendance. In March 2018, I-95 was renumbered to I-295 between US 1 in Lawrence Township, New Jersey, and Taylorsville Road in Lower Makefield Township, Pennsylvania . The redesignation that officially bridged

2145-549: The border of Linden and Elizabeth at the western approach to the Goethals Bridge . In the northern part of Elizabeth, the New Jersey Turnpike comes to Route 81 which provides access to Newark Liberty International Airport before the road runs to the east of the airport. After the airport, I-95 intersects I-78 in Newark , Essex County . At US 1/9 Truck , the New Jersey Turnpike splits into two alignments and enters

2200-692: The bridge named after William Penn . To maintain the "high-speed, low-interruption" characteristics ("low interruption" referring to the few stops needed to pay tolls or fuel up at the numerous full-service plazas on both routes), the new bridge was designed from the beginning as a high-level crossing. This sharply contrasts with the Tacony–Palmyra Bridge and the Burlington–Bristol Bridge located downstream as they are both drawbridges , and are subject to frequent openings to allow large ships up and down stream (all other bridges downstream from

2255-479: The cost increasing to $ 375 million (equivalent to $ 1.27 billion in 2023 ) in 1979. At this point, residents in Hopewell Township, Princeton , and Montgomery Township raised opposition out of the fear the Somerset Freeway would bring unwanted development to area farmland. The NJTA joined environmental and community groups in opposing the Somerset Freeway, as it would provide a toll-free alternative to

List of Interstate Highways in New Jersey - Misplaced Pages Continue

2310-629: The end of the ticket system. The Western Spur of the New Jersey Turnpike is also signed as I-95 but is officially known as Route 95W. This road has interchanges serving I-280 in Kearny and Route 3 in East Rutherford , Bergen County , the latter connecting to Route 120 and CR 503 , serving the Meadowlands Sports Complex . The ticket system on the Western Spur ends at

2365-583: The exit for Route 133 / Route 33 , located to the east of Hightstown . Heading into Middlesex County , development near the highway increases. At this point, an interchange serves Route 32 in Monroe Township . Continuing north into more dense suburban development, I-95 intersects Route 18 in East Brunswick near the city of New Brunswick . After crossing the Raritan River ,

2420-553: The free routing of I-95 in New Jersey, was to divert from the loop between the Route ;31 and Federal City Road exits in Hopewell Township . Then, the highway was to intersect CR 546 and US 206 before coming to I-287 in Piscataway . There was also meant to be a small connector roughly one mile (1.6 km) in length connecting I-95 with I-287 from the north and designated Interstate 695 ( I-695 ). (The I-695 designation, along with I-95's alignment in Piscataway,

2475-543: The load from each original 4-inch-diameter (10 cm) wire rope was transferred into a set of four new 2-inch-diameter (5.1 cm) wire ropes, after which the original suspender was cut. The project was completed in August 2013. On January 3, 2016, the Pennsylvania Turnpike Commission implemented cashless tolling via either E-ZPass or toll-by-plate, which uses automatic license plate recognition to take

2530-585: The mainline of the New Jersey Turnpike, with 12 lanes featuring six inner lanes exclusively for cars separated from six outer lanes for cars, trucks, and buses. It soon reaches an exit for US 206 in Bordentown Township . Continuing north through mostly rural areas, the road heads into Mercer County and comes to the I-195 interchange in Robbinsville Township . In East Windsor , I-95 reaches

2585-416: The new interchange. I-295 was initially chosen to be extended in this manner, but, in 2005, the plans were modified to extend I-195 from its current western terminus at I-295 and then north along I-295 and I-95 (bypassing Trenton) to the Scudder Falls Bridge and the new interchange. On May 20, 2015, the plans were reverted to extend I-295 to the interchange. The multiphased construction began in late 2010, and

2640-506: The northbound "express" lane only leads exclusively to I-80 west while the northbound local lanes continues as the main trunk of I-95. (On the southbound side, the "express" lanes function as the main trunk of I-95 south while the southbound local lanes lead exclusively from I-80 east.) The road runs near suburban neighborhoods before entering Teaneck and intersecting with the eastern terminus of I-80 . From here, I-95 turns northeast and splits into an actual local–express lane configuration with

2695-406: The state reconsider building the Somerset Freeway as a way to alleviate traffic on area roads. This option was ruled out due to a $ 700-million (equivalent to $ 1.28 billion in 2023 ) pricetag. Also around this time, I-95 was extended east along I-295 between the site of the Somerset Freeway interchange and US 1 in Lawrence Township . Due to the cancelation of the Somerset Freeway in 1983,

2750-458: The upsurge of automobile traffic in 1946, the Pennsylvania Turnpike expanded from the original 110-mile (180 km) highway west from Irwin to the Ohio border and east from Carlisle to Valley Forge. At the same time, New Jersey, lacking a high-speed corridor, undertook the building of the New Jersey Turnpike under the auspices of then- Governor of New Jersey Alfred E. Driscoll . In order to provide

2805-481: The year after the project's completion, the other half of the bridge began to be re-decked by the New Jersey Turnpike Authority. In 2011, the NJTA and PTC undertook an investigation of the existing suspender system on the main span. Based on destructive testing of suspenders from the similar Newark Bay Bridge , consultants HNTB determined that the Delaware River bridge's suspenders had limited remaining service life and needed to be replaced. At each suspender location,

SECTION 50

#1732858895149

2860-529: Was dropped when I-695's own alignment became the preferred routing for I-95 to a full three-way interchange with I-287 in Franklin Township . ) At this point, the freeway would have continued northeastward through the western parts of Elizabeth and Newark, then terminate at the northern terminus of the New Jersey Turnpike at Ridgefield, but it was instead decided to route I-95 along the New Jersey Turnpike through North Jersey. The truncated route, known as

2915-470: Was filled, traffic from Pennsylvania was directed along I-95 northbound (to the Scudder Falls Bridge), then on its continuation as I-295 southbound until its interchange at I-195, which leads eastward to the New Jersey Turnpike. In order to close the gap, an interchange was constructed between I-95 and the Pennsylvania Turnpike in Bristol Township, Pennsylvania . The interchange was first planned in

2970-476: Was located in an I-beam located approximately 80 ft (24 m) above ground on the Pennsylvania side and caused the bridge to drop by about 1 in (25 mm). Steel plates were installed as a temporary patch to stabilize the bridge and prevent further movement. The Assistant Chief Engineer for the Pennsylvania Turnpike Commission stated that ..."the crack likely was caused by a combination of factors, including age and plug welds that were commonly used in

3025-399: Was transferred to the NJTA in 1992 in order to balance the state budget, thus incorporating it as an extension of the turnpike. The location of I-95 in the Trenton area had not been finalized when the route was first designated. The BPR preferred using the Trenton Freeway (US 1 and Route 174 ), which was completed to Whitehead Road, but New Jersey and Pennsylvania proposed using

#148851